Project
| Benefit
| Methods
|
Developed a capacity planning tool that allowed the planner to level-load the cartridge production work center. |
Improved on time deliveries to 95+ percent. |
Kaizen, Flow, JIT, Pull, Leveled Producton |
Implemented a job estimating and work backlog tracking system for product engineering. Leveled work load and tracked on-time performance in the manufacturing of custom electric heaters and heater systems. |
Eliminated 3 month past due orders, got engineering on time and improved efficiency by 20%. |
Kaizen, Flow, JIT, Level Workload |
Implemented a job estimating and work backlog tracking system for engineering. Leveled work load and tracked on-time performance for custom designed fluid food product capital equipment heat transfer and processing systems. |
Reduced cycle time and got engineered orders on time. |
Kaizen, Flow, JIT, Level Workload |